#1 2023-12-25 11:54:29

Elton1497
Member
Registered: 2023-12-23
Posts: 29
Website

↑ „Größtes Projekt Seit dem Limes“

At the tip of July 2023, two younger cattle egrets were detected at Altmühlsee. Since 1994, water has been pumped from the Danube to the top of the canal using pumps at the 5 locks on the southern ramp of the canal, from where it flows downwards over another barrage into the Rothsee, the place the water is saved and, if needed, in two completely different ways can also be delivered to the Regnitz. The Danube-Major transfer system contains a total of three lakes, together with the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which include 5 dams on account of their pre-dams, three hydroelectric energy plants at the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 different weirs on watercourses, a few of which have been expanded to accommodate greater water stream. This water then flows by means of a energy plant with three megawatts of electrical energy on the Hilpoltstein lock with a fall height of 24.67 m. In the years 1994-2013, a median of 97 million m³ of water were transferred to the Rothsee yearly, the natural inflow of the small Roth was around 1995-2013 on average 27.9 million m³ of water was over The water sheath was transferred, after the top of the compensation, an average of 26.5 million m³ was transferred in 1999-2013 and 28.7 million m³ were given from the Brombachsee, whereby 11 million m³ of further inflow is anticipated from the catchment area of the Brombach every year.


Here is my webpage - Brombachsee (http://chat.bomjtrek.site/sunnyconover)

Offline

Board footer

Powered by FluxBB