#1 2023-12-26 08:11:57

Elton1497
Member
Registered: 2023-12-23
Posts: 29
Website

↑ „Größtes Projekt Seit dem Limes“

The Danube-Fundamental switch system includes a total of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which embrace five dams due to their pre-dams, three hydroelectric power plants at the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 different weirs on watercourses, some of which have been expanded to accommodate larger water circulation. The old grinding and sawmill with its three water wheels was changed by the Bavarian state during the construction of the Kleiner Brombachsee and demolished in 1986. For 1837 we be taught that the Öfeleinsmühle is a grinding and (individually standing) sawmill that has two grinding aisles and a tanning aisle and that features nearly 2 days of ponds, a small vegetable backyard, 33 days of arable land, 11.5 days of meadows and 108 Day's work includes forest. West-Central Franconia, during which intensive agricultural use won't be attainable and relatively little business is located, was structurally supported by way of the simultaneous creation of a local recreation space for the Nuremberg metropolitan area.


Here is my webpage - Brombachsee (http://chat.bomjtrek.site/sunnyconover)

Offline

Board footer

Powered by FluxBB