#1 2023-12-25 17:52:11

WilburShil
Member
Registered: 2023-12-25
Posts: 1
Website

↑ „Größtes Projekt Seit dem Limes“

↑ Jürgen Eisenbrand: Sediments from Altmühlsee end up in synthetic basins. These sediments have been removed since September 2015, every autumn and winter. This page was final edited on September 1, 2021 at 11:Forty am. This page was last edited on August 30, 2022 at 10:37 am. This page was final edited on March 25, 2023 at 4:46 a.m. This web page was final edited on August 3, 2023 at 10:Fifty five am. This page was final edited on June 26, 2023 at 2:17 am. After it was dismantled due to dilapidation, it's now related to the trail by a connecting causeway. The costs of constructing the system, the detailed planning of which began in 1971 by the Nuremberg Dam Construction Authority, which existed till 2000, amounted to approx. The Großer Brombachsee, dammed by the primary dam, serves as a reservoir and the water degree can fluctuate by up to seven meters during regular operation as a result of irregular inflow and outflow. The Birkenhof north of Absberg between the 2 our bodies of water Igelsbach and Gänsbach, whose corridor also sank into the Großer Brombachsee, solely existed as a barn by 1962. By 1962, just one barn was left standing on the Birkenhof north of Absberg between the two bodies of water, Igelsbach and Gänsbach, whose land also sank into the Großer Brombachsee.


Check out my blog post ... Fränkisches Seenland - head to the lolipop-pandahouse.ssl-lolipop.jp site,

Offline

Board footer

Powered by FluxBB