#1 2024-03-28 22:14:16

RuthProbst
Member
Registered: 2024-03-24
Posts: 18
Website

↑ „Größtes Projekt Seit dem Limes“

The character reserves of the Igelsbachsee reservoir, the peninsula in the Kleiner Brombachsee, the Brombachmoor and the Sägmühle are additionally situated on the Brombachsee. The water level of the Kleiner Brombachsee, like that of the Igelsbachsee, which is fed by the second giant tributary Igelsbach, is saved largely constant by a pre-dam. At the Eckersmühlen lock it's channeled from the upper water into the immediately neighboring Rothsee, a reservoir created within the Kleine Roth valley. The Danube-Important switch system includes a total of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which embody five dams as a result of their pre-dams, three hydroelectric power plants at the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 different weirs on watercourses, some of which have been expanded to accommodate increased water movement. This water then flows by means of a energy plant with three megawatts of electrical output on the Hilpoltstein lock with a head of 24.67 m. Since then, it has hosted a large number of Max Planck young analysis teams and Alexander von Humboldt scholarship holders and, with the School of Engineering, has been concerned in the 2 Excellence Initiative establishments that were set up on the College of Erlangen-Nuremberg in 2004.


My web page :: Fränkisches Seenland [click through the following website]

Offline

Board footer

Powered by FluxBB