#1 2024-03-28 18:37:01

Felix3409
Member
Registered: 2024-03-23
Posts: 30
Website

↑ „Größtes Projekt Seit dem Limes“

The character reserves of the Igelsbachsee reservoir, the peninsula within the Kleiner Brombachsee, the Brombachmoor and the Sägmühle are also positioned on the Brombachsee. The water level of the Kleiner Brombachsee, like that of the Igelsbachsee, which is fed by the second large tributary Igelsbach, is kept largely constant by a pre-dam. At the Eckersmühlen lock it is channeled from the upper water into the immediately neighboring Rothsee, a reservoir created in the Kleine Roth valley. The Danube-Predominant transfer system contains a complete of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which include 5 dams attributable to their pre-dams, three hydroelectric power plants at the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 different weirs on watercourses, a few of which have been expanded to accommodate larger water movement. This water then flows by a power plant with 3 megawatts of electrical output at the Hilpoltstein lock with a head of 24.67 m. Since then, it has hosted a lot of Max Planck young research teams and Alexander von Humboldt scholarship holders and, with the School of Engineering, has been involved in the 2 Excellence Initiative establishments that had been set up on the College of Erlangen-Nuremberg in 2004.


Feel free to visit my web-site http://1salonlofts.com/ (click the following document)

Offline

Board footer

Powered by FluxBB