#1 2024-03-19 06:07:32

Maureen742
Member
Registered: 2024-03-16
Posts: 28
Website

↑ „Größtes Projekt Seit dem Limes“

The Danube-Principal switch system consists of a complete of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which embody five dams resulting from their pre-dams, three hydroelectric energy plants on the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 other weirs on watercourses, some of which have been expanded to accommodate higher water move. The old grinding and sawmill with its three water wheels was replaced by the Bavarian state during the construction of the Kleiner Brombachsee and demolished in 1986. For 1837 we learn that the Öfeleinsmühle is a grinding and (individually standing) sawmill that has two grinding aisles and a tanning aisle and that features almost 2 days of ponds, a small vegetable garden, 33 days of arable land, 11.5 days of meadows and 108 Day's work includes forest. West-Central Franconia, wherein intensive agricultural use is just not doable and relatively little trade is located, was structurally supported via the simultaneous creation of an area recreation space for the Nuremberg metropolitan area.

Offline

Board footer

Powered by FluxBB