#1 2023-12-24 19:58:18

Elton1497
Member
Registered: 2023-12-23
Posts: 29
Website

↑ „Größtes Projekt Seit dem Limes“

At the top of July 2023, two young cattle egrets had been detected at Altmühlsee. Since 1994, water has been pumped from the Danube to the top of the canal using pumps at the five locks on the southern ramp of the canal, from where it flows downwards over another barrage into the Rothsee, the place the water is stored and, if vital, in two totally different ways can be delivered to the Regnitz. The Danube-Essential switch system consists of a complete of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which include five dams attributable to their pre-dams, three hydroelectric power plants on the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee as well as 27 other weirs on watercourses, a few of which have been expanded to accommodate higher water movement. This water then flows through a energy plant with three megawatts of electrical power on the Hilpoltstein lock with a fall peak of 24.67 m. Within the years 1994-2013, a median of 97 million m³ of water were transferred to the Rothsee annually, the natural inflow of the small Roth was around 1995-2013 on common 27.9 million m³ of water was over The water sheath was transferred, after the tip of the compensation, a mean of 26.5 million m³ was transferred in 1999-2013 and 28.7 million m³ have been given from the Brombachsee, whereby eleven million m³ of extra inflow is predicted from the catchment area of the Brombach every year.


Here is my webpage - Brombachsee (http://chat.bomjtrek.site/sunnyconover)

Offline

Board footer

Powered by FluxBB