#1 2024-03-26 12:29:16

OlenWayne0
Member
Registered: 2024-03-21
Posts: 9
Website

↑ „Größtes Projekt Seit dem Limes“

At the top of July 2023, two young cattle egrets have been detected at Altmühlsee. Since 1994, water has been pumped from the Danube to the highest of the canal using pumps at the five locks on the southern ramp of the canal, from the place it flows downwards over one other barrage into the Rothsee, where the water is stored and, if necessary, in two other ways can be delivered to the Regnitz. The Danube-Fundamental switch system contains a total of three lakes, together with the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which embrace five dams as a result of their pre-dams, three hydroelectric power plants on the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee as well as 27 other weirs on watercourses, some of which have been expanded to accommodate higher water circulation. This water then flows by a energy plant with 3 megawatts of electrical energy on the Hilpoltstein lock with a fall height of 24.67 m. Within the years 1994-2013, a mean of ninety seven million m³ of water were transferred to the Rothsee yearly, the natural inflow of the small Roth was around 1995-2013 on average 27.9 million m³ of water was over The water sheath was transferred, after the top of the compensation, a mean of 26.5 million m³ was transferred in 1999-2013 and 28.7 million m³ have been given from the Brombachsee, whereby 11 million m³ of additional inflow is expected from the catchment space of the Brombach yearly.


My web site: Fränkisches Seenland - more resources,

Offline

Board footer

Powered by FluxBB