#1 2024-03-26 09:47:00

BrodiePaxs
Member
Registered: 2024-03-19
Posts: 26
Website

↑ „Größtes Projekt Seit dem Limes“

The Danube-Essential transfer system contains a total of three lakes, together with the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which include five dams as a result of their pre-dams, three hydroelectric energy plants on the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 different weirs on watercourses, some of which have been expanded to accommodate increased water circulation. The previous grinding and sawmill with its three water wheels was replaced by the Bavarian state throughout the development of the Kleiner Brombachsee and demolished in 1986. For 1837 we be taught that the Öfeleinsmühle is a grinding and (individually standing) sawmill that has two grinding aisles and a tanning aisle and that includes virtually 2 days of ponds, a small vegetable garden, 33 days of arable land, 11.5 days of meadows and 108 Day's work consists of forest. West-Central Franconia, during which intensive agricultural use isn't potential and comparatively little business is situated, was structurally supported through the simultaneous creation of an area recreation area for the Nuremberg metropolitan space.


My web-site - Fränkisches Seenland (click through the up coming article)

Offline

Board footer

Powered by FluxBB