#1 2024-03-22 08:18:50

Maureen742
Member
Registered: 2024-03-16
Posts: 28
Website

↑ „Größtes Projekt Seit dem Limes“

The nature reserves of the Igelsbachsee reservoir, the peninsula within the Kleiner Brombachsee, the Brombachmoor and the Sägmühle are also located on the Brombachsee. The water level of the Kleiner Brombachsee, like that of the Igelsbachsee, which is fed by the second large tributary Igelsbach, is saved largely fixed by a pre-dam. At the Eckersmühlen lock it is channeled from the higher water into the immediately neighboring Rothsee, a reservoir created in the Kleine Roth valley. The Danube-Foremost switch system consists of a total of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which include 5 dams as a consequence of their pre-dams, three hydroelectric power plants on the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee as well as 27 different weirs on watercourses, a few of which have been expanded to accommodate higher water circulation. This water then flows through a energy plant with 3 megawatts of electrical output at the Hilpoltstein lock with a head of 24.67 m. Since then, it has hosted a lot of Max Planck younger analysis teams and Alexander von Humboldt scholarship holders and, with the School of Engineering, has been involved in the 2 Excellence Initiative institutions that were arrange on the University of Erlangen-Nuremberg in 2004.

Offline

Board footer

Powered by FluxBB