#1 2024-01-28 11:54:22

FeliciaCub
Member
Registered: 2024-01-26
Posts: 19
Website

↑ „Größtes Projekt Seit dem Limes“

The Danube-Major switch system consists of a complete of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which include five dams on account of their pre-dams, three hydroelectric energy plants on the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 different weirs on watercourses, a few of which have been expanded to accommodate higher water move. The outdated grinding and sawmill with its three water wheels was changed by the Bavarian state during the development of the Kleiner Brombachsee and demolished in 1986. For 1837 we be taught that the Öfeleinsmühle is a grinding and (separately standing) sawmill that has two grinding aisles and a tanning aisle and that includes nearly 2 days of ponds, a small vegetable garden, 33 days of arable land, 11.5 days of meadows and 108 Day's work consists of forest. West-Central Franconia, by which intensive agricultural use is just not doable and relatively little industry is situated, was structurally supported by means of the simultaneous creation of a neighborhood recreation space for the Nuremberg metropolitan area.


Also visit my site ... Fränkisches Seenland - you can look here -

Offline

Board footer

Powered by FluxBB