#1 2024-03-26 03:01:39

GennieHoll
Member
Registered: 2024-03-24
Posts: 4
Website

↑ „Größtes Projekt Seit dem Limes“

Not like the larger lakes in the area equivalent to Brombachsee and Altmühlsee, it is not used to transfer water that flows naturally from the Danube into the Regnitz and Fundamental river systems. In the long run, a mean annual transfer by way of the whole system of 150 million m³ of water is predicted, 5/6 of which through the primary- Danube Canal. However, when the algae drawback happens in the inflowing lakes, new water is often not fed into the lake, which suggests the water degree drops significantly in summer season season . It is surrounded by a ditch that runs throughout and was previously crammed with water. A small stream flows by the ditch from the south. The final homeowners, Hermann and Elsa Walter, ran the mill&# 39, s agriculture and sawmill until the mill was demolished in the 1980s and the Kleiner Brombachsee was flooded. The Furthmühle has been run by the Walter family since 1748. The mill had been operated by the Walter family since 1858 until the property was bought by the Free State of Bavaria tobuild the Kleiner Brombachsee. Since 1999, flood water on the increased Altmühl has been diverted into the Altmühlsee, from where it flows by a tunnel into the Brombachsee, which is already deeper on the opposite aspect of the watershed. On the solution to Brombachsee, the watershed is crossed once extra.


Here is my web-site :: Altmühlsee

Offline

Board footer

Powered by FluxBB