#1 2024-03-17 11:34:42

CornellKei
Member
Registered: 2024-03-15
Posts: 38
Website

↑ „Größtes Projekt Seit dem Limes“

↑ Jürgen Eisenbrand: Sediments from Altmühlsee end up in artificial basins. These sediments have been removed since September 2015, every autumn and winter. This web page was last edited on September 1, 2021 at 11:40 am. This page was last edited on August 30, 2022 at 10:37 am. This page was final edited on March 25, 2023 at 4:Forty six a.m. This web page was last edited on August 3, 2023 at 10:55 am. This web page was last edited on June 26, 2023 at 2:17 am. After it was dismantled resulting from dilapidation, it's now linked to the trail by a connecting causeway. The costs of constructing the system, the detailed planning of which began in 1971 by the Nuremberg Dam Building Authority, which existed until 2000, amounted to approx. The Großer Brombachsee, dammed by the primary dam, serves as a reservoir and the water level can fluctuate by as much as seven meters throughout regular operation because of the irregular inflow and outflow. The Birkenhof north of Absberg between the two our bodies of water Igelsbach and Gänsbach, whose corridor also sank into the Großer Brombachsee, solely existed as a barn by 1962. By 1962, only one barn was left standing on the Birkenhof north of Absberg between the 2 bodies of water, Igelsbach and Gänsbach, whose land additionally sank into the Großer Brombachsee.


Here is my web site; recent post by Championins (please click the up coming website page)

Offline

Board footer

Powered by FluxBB