#1 Milla Forums » ↑ „Größtes Projekt Seit dem Limes“ » 2024-01-30 11:22:03

Margie4020
Replies: 0

↑ Jürgen Eisenbrand: Sediments from Altmühlsee end up in artificial basins. These sediments have been removed since September 2015, every autumn and winter. This web page was final edited on September 1, 2021 at 11:40 am. This web page was last edited on August 30, 2022 at 10:37 am. This page was last edited on March 25, 2023 at 4:46 a.m. This page was last edited on August 3, 2023 at 10:Fifty five am. This web page was final edited on June 26, 2023 at 2:17 am. After it was dismantled as a consequence of dilapidation, it is now linked to the trail by a connecting causeway. The costs of constructing the system, the detailed planning of which began in 1971 by the Nuremberg Dam Construction Authority, which existed until 2000, amounted to approx. The Großer Brombachsee, dammed by the main dam, serves as a reservoir and the water stage can fluctuate by as much as seven meters throughout common operation as a result of irregular inflow and outflow. The Birkenhof north of Absberg between the 2 our bodies of water Igelsbach and Gänsbach, whose corridor additionally sank into the Großer Brombachsee, only existed as a barn by 1962. By 1962, just one barn was left standing on the Birkenhof north of Absberg between the two our bodies of water, Igelsbach and Gänsbach, whose land additionally sank into the Großer Brombachsee.

Board footer

Powered by FluxBB